SERVICE PERFORMANCE ADVANTAGES

SERVICE PERFORMANCE ADVANTAGES

  • >300

    Over 300 ships service experience

  • 6000T
    30000T

    Has served 6,000 tons to 300,000 tons of oil tankers

  • 6000T
    70000T

    Has served 6,000-70,000 tons of chemical tankers

KEY ADVANTAGES

  • WHOLE PROCESS TECHNICAL DESIGN
    1.WHOLE PROCESS TECHNICAL DESIGN

    YADA independently developed the cargo tank heating coil calculation program, which can be used for quick design according to the requirements of specifications: from 3,000t liquid cargo vessel to 350,000t VLCC. From a few cubic meters of oil tank to thousands of cubic meters of cargo tank, YADA can provide corresponding services.

  • PROFESSIONAL LAYOUT DESIGN
    2.PROFESSIONAL LAYOUT DESIGN

    YADA provides integrated solutions from heating calculation, layout, production design (unit design), product production, unit integration, installation and commissioning according to the background structure and heating requirements from shipyard.

  • STANDARD PRODUCTION AND INTEGRATION
    3.STANDARD PRODUCTION AND INTEGRATION

    According to the design drawings, the professional front-line construction personnel will carry out the production of heating coil products and unit integration services to ensure the production efficiency.

  • WHOLE PROCESS QUALITY CONTROL
    4.WHOLE PROCESS QUALITY CONTROL

    YADA has standard production process including raw material re-inspection, prefabricated elbows, end flaring, passivation treatment, inner and outer wall cleaning, sub-pallet packaging and shipping process. The interface adopts flaring design, which is convenient for on-site construction and quality guarantee.

  • PROPER PACKAGE AND TRANSPORTATION
    5.PROPER PACKAGE AND TRANSPORTATION

    The products will be properly packaged and transported to the customer's project site in a proper way, and the on-site installation service is carried out by a professional installation team.

  • PROFESSIONAL INSTALLATION SERVICE
    6.PROFESSIONAL INSTALLATION SERVICE

    The professional team carries out on-site installation and product testing, on-site welding, pipe supports installation, NDT, etc. until the completion of construction, so as to provide customers with high-quality heating coil products.

  • FULL COVERAGE OF QUALIFICATION CERTIFICATES
    7.FULL COVERAGE OF QUALIFICATION CERTIFICATES

    The company has obtained nine class society certificates, 39 international certifications, and 6 industry certifications. Full coverage of Austenitic stainless steel, Duplex steel, Super duplex steel and other materials, full coverage of welding process, pipe wall thickness and diameters. 